4Site
Support Request System
View Patch #50.037.024
Description
Patch ID:
Date Implemented:
Patch Title:
Patch Type:
Request IDs:
Bug
Enhancement
Other
02711 -
Maintenance Cost Centre Commodity Report
Enhancement Description:
Provide a cost centre drill down report.
Solution:
The Cost Center Drill Down Report details maintenance costs for a selected maintenance cost center or for all maintenance cost centers. Costs are extracted based on a entered starting and ending fiscal period. The costs are displayed in the categories external materials, external labour, internal material, internal labour and other costs. The report is a drill-down style report, meaning costs are displayed for the top-level cost center first. To display lower level costs drill-down by double-clicking the cost center number. To display transactions costed to the cost center, click the details link which are either direct charges or charges to an equipment which is owned by the cost center.
Browse Patches
Find a Patch
Return to Request System Menu